Climbing protection screen

Brand
Huamei
Article No
3CFC07031363
Supplier ID
S0254
Supply Capability:
Ensure to complete the supply on time, according to the quality and quantity
Lead time:
1-2 months
Trade Terms:
Ex UAE warehouse
Payment Terms :
TT in Advance
Certification :
Origin :
CN
Ref Price
USD 5400 /Tons
100 (Min. Order Quantity)
Enquire Now Add to favorites

          1.      Attached lifting scaffold (referred to as climbing protection screen) refers to the construction of a certain height and attached to the engineering structure, relying on its own lifting equipment and devices, which can be layered with the engineering structure 。Climbing or descending, external scaffold with anti overturning and anti falling device; it can change high-altitude operation into low-level operation, and change suspended operation into internal operation of scaffold body remarkable low-carbon, high-tech content and more economic, safer, more convenient and other characteristics.

          2. Climbing protection screen characteristics:

(1). The intelligent and accurate control system, reliable operation

(2). The double set of anti-falling device and positioning device, safe and secure

(3). The automatic reciprocating cycle of power equipment to reduce the labour intensity of workers

(4). All walkways are unobstructed, and the bottom is completely sealed

(5). Combined with integral hoisting, the erection speed is fast

(6). Moderate weight of components and fittings, easy installation for workers

(7). The service life of the main components after hot-dipping zinc treatment reaches 20 years, the cost of single maintenance is reduced by 60%, and the storage cost is reduced by 50%

(8). It is a strong versatility of components, more turnover times, green environmental protection concept design, reuserate of more than 95 %


3.Requirements for frame structure:

(1). The frame height shall not be more than 5 times the floor height;
(2). The frame width shall not be less than 0.8m and 1.2m;
(3). The support span of the frame arranged in a straight line shall not be greater than 7m, and the outer distance of the frame arranged in a broken line or curve    shall not be greater than5.4m;
(4). The horizontal cantilever length of the frame body shall not be greater than 2m, and shall not be greater than 1 / 2 of the span;
(5). The product of the whole height of the scaffold and the support span shall not be greater than 110m2.

4.Anti falling device:

 (1)The anti falling device shall be set separately from the lifting device, and shall not be set in combination with the lifting devic

(2). Each lifting point shall not be less than one anti falling device, which must work under the use and lifting conditions;

(3). The anti falling device must be mechanical,it is forbidden to use the manual device which needs to be reorganized every time of lifting.

5. Lifting equipment

 (1).The attached lifting scaffold shall be equipped with a low-speed electric chain hoist with lifting power and lifting speed of 90mm / min ~ 200mm / min; its rated lifting capacity shall be more than or equal to 2 times of stand load, and not less than 7.5t.

(2).The through center hydraulic jack shall be selected as the lifting power. The piercer bar shall be made of round steel with an outer diameter of 40mm and processed into a slub shape.

6.Synchronism control device

(1).When the load of a certain stand exceeds 15% of the design value, the automatic alarm and display alarm stand shall be in the form of sound and light; when the load exceeds 30%, it shall be able to make the rise automatic shutdown of downcomer;

(2).It shall have the functions of overload, loss of load, alarm and shutdown.





 


No.

Sub item

unit

Main indicators

Actual indicators of the project

1

Frame width

m

0.6

 

2

Frame height

m

4.5 storey high

 

3

Supporting span

m

≤7.0

 

4

Stand height

m

1.0~4.5

23

5

Overhanging length of frame end

m

≤2.0

 

6

Self weight of frame

t

 Average bit per point:2.0-2.8

2.0-2.4

7

Distance between operation floor and wall

mm

≤200

200

8

Allowable construction load

 

3×2kN/㎡or2×3 kN/㎡

The allowable load of 3-storey construction at the same time is 2Kn / m2

 

The allowable load of two layers constructed at the same time is 3kn / m2

9

Climbing frame lifting time

hour

1.5-2 hours / floor

1.5-2hours

10

Electric hoist power

w

500

500

11

Speed up

mm/min

120

120

12

Rated tonnage of electric hoist

t

7.5

7.5

13

Embedded horizontal deviation

mm

30

30

14

Fire protection standard for climbing platform

 

Fire prevention

Fire prevention

15

Construction load transfer floor

floor

2floors

2floor

16

Number of guide seats

set

3

3

17

Does electric hoist need turnover

 

unwanted

unwanted

18

Maximum weight of turnover parts

KG

25

25

19

Number of floors per lift

floor

1

1

20

Falling distance

mm

20-60

20-60

21

Number of fall arresters

individual

Each machine position is equipped with 2 roof fall arrestors

Each machine position is equipped with 3 roof fall arrestors

Packaging

standard package

After Sales Warranty

CNBN is not responsible for the quality of goods and the package of the goods

Sinopro Service Pledge
Sinopro Service Pledge
  • Quality Product
  • Order On-Line Tracking
  • Timely Delivery
Sinopro Service Pledge
Sinopro Service Pledge
  • Credit Rating
  • Credit Services
  • Credit Purchasing
Sinopro Service Pledge
Sinopro Service Pledge
  • 427+ Categories
  • 2800+ Suppliers
  • 200+ Brands
Top