Integrated attached lifting scaffold
An anti-drop device designed with no-drop concept; when the mechanism of the anti-drop device itself is completely normal, the lifting frame is allowed to descend slowly, when the mechanism has
When the failure or the descent speed is accelerated, the lifting frame is stuck and cannot be lowered
• There will be no chained fall or tipping over each station; each station can only run roughly simultaneously, otherwise it will be stuck and cannot be raised and lowered due to mutual involvement
• Multi-point coordinated bearing capacity, automatic balanced bearing, avoiding the risk of a bearing bearing a large stress concentration
•Automatically adjust the secondary stress; the guide seat and the guide rail have the function of automatically eliminating excessive jamming and pushing the secondary stress, and all structural parts have no plastic change
• Shape, friction resistance is very small when lifting, stable lifting
•High degree of mechanization, low labor intensity, and possible erroneous operation is small; full mechanized automatic positioning of frame lifting
• Fast; the lifting scaffold itself is fast, and does not occupy construction equipment such as tower crane during lifting, the construction speed of the project is significantly accelerated
•Safe, civilized, good image, environmental protection
• The only automatic operation of the ring automatic scaffolding is the installation of the guide base, and our guide base is only more than 10 kg, and the rest
The work has been fully mechanized and automated
The standards that the company develops, designs, and operates for the quality of building construction equipment products include relevant regulations, industry standards, and company standards. Specifically, it includes national regulations: "Notice on Promulgating the "Interim Provisions for the Management of Attached Lifting Scaffolding in Construction Construction"" (Jianjian [2000] No. 230); Industry Standards: "Standards for Safety Inspection of Construction Construction" (JGJ 59-2011), "Building Construction Tool Scaffolding Safety Technical Specification (JGJ 202-2010), "Aluminum Alloy Structure Design Specification" (GB 50429-2007), "Building Construction Formwork Safety Technical Specification" (JGJ 162-2008); Enterprise Standard: "Foldable "Elevating Scaffold" (Q/STC005-2009), "Elevating Unloading Platform" (Q/STC006-2011), "Intelligent Lifting Platform for High-rise Construction" (Q/STC007-2012), "High Support Formwork" (Q/STC007-2012) STC008-2012), "Aluminum alloy template" (Q/STC009-2012), etc. Among them, the company is the participating unit of the industry standard "Technical Specifications for Safety of Construction Tool Scaffolding".
Packaging
Material box
After Sales Warranty
The first product to use provides a warranty period
Sinopro Service Pledge
- Quality Product
- Order On-Line Tracking
- Timely Delivery
Sinopro Service Pledge
- Credit Rating
- Credit Services
- Credit Purchasing
Sinopro Service Pledge
- 427+ Categories
- 2800+ Suppliers
- 200+ Brands