EXPO 2020 Bridge Link Project
Project
EXPO 2020 Bridge Link Project
Owner or Developer
RTA Authority Dubai Government
Main Contractor
Larsen Toubro Limited
Project Duration
2 Years
Total Tender value
USD205M
Status
Completed
Address
Dubai Expo Road Jebel Ali
Cooperation details of the projects
Film Faced Plywood, White Wood, Scaffolding Components, Wooden scaffold board
EXPO 2020 Bridge Link Project
The project s scope of work involves the construction of the road access to the Expo 2020 site located in Dubai. Phase 1 entails a number of intersections and access roads.
The project includes converting the existing roundabout at the intersection of Sheikh Mohammed bin Zayed Road (E311) and Jebel Ali–Lehbab Road (E77) to a flyover enabling free traffic movement in all directions. Jebel Ali–Lehbab Road will be upgraded through the construction of two bridges of six lanes in each direction along with turns and direct ramps to ensure a smooth flow of traffic from Sheikh Mohammed bin Zayed Road to and from Abu Dhabi.
The project also includes roadworks extending 27 kilometers (km) on Jebel Ali-Lehbab Road (E77), involving the widening of the road from four to six lanes in each direction, installation of street lighting, signaling and associated facilities and in addition to constructing service roads in both directions and four bridges.
- Prev : Akoya Play
- Next : Akoya Oxygen Evo Townhomes