1.Advantages of aluminum formwork

(1).Light weight, less than 19kg / m2.

(2).The construction is convenient, and the aluminum building formwork is easy to assemble, which can be assembled manually, or assembled into pieces and then hoisted by machinery as a whole.

(3).Standardized construction, high turnover times, normal use can reach 300 times.

(4).It has a wide range of applications. Use of wall formwork, horizontal floor slab, column, beam, climbing formwork and other formworks for aluminum building formwork.

(5).The construction period is short, 2-3 times faster than the general formwork construction.

(6).The bearing capacity is large, and the aluminum formwork can bear 30KN per square meter.

(7).High recycling value. The residual value of aluminum construction formwork is high, and the average cost advantage is obvious.


2.Component

Aluminum System plastic wood formwork is composed of aluminum frame formwork system, fastening system, support system, accessory system composed of four systems.

(1).Aluminum System formwork system: Concrete structure construction the closed surface, ensure that the structure when the concrete casting molding.

(2).Fastening systems: To ensure the structure of the size, thickness, no deformation in the process of pouring concrete, and the formwork does not appear the phenomenon of swelling and explosion.

(3).Supporting system: It plays a supporting role in the construction of concrete structure, and ensures the stability of the floor, the bottom of the beam and the cantilever structure.

(4).Accessory system: The formwork is connection components, to make odd template connected into a system, composed of the whole.

Aluminum formwork parameters

No.

    performance

Performance introduction

remarks

1

Formwork specification

Systematization and standardization

 

2

Load performance

60KN/M2

Uniform force

3

Early demolition technology

One floor of formwork, three floors of support

 

4

Construction period

5 days / floor (guaranteed)

It can reach 3.5 days / layer as soon as possible

5

Construction efficiency

10-30m2 / day / person

 

6

Energy saving and environmental protection

Usually 100 times

Low loss

7

Allocation of workers

Need skilled general assembly workers

 

8

Quality effect

Flatness and perpendicularity are guaranteed

No further plastering is required

9

Construction waste

Recyclable and reusable

No construction waste

10

Tower crane

Independent of tower crane

Packaging

standard package

After Sales Warranty

Sinopro Service Pledge
Sinopro Service Pledge
  • Quality Product
  • Order On-Line Tracking
  • Timely Delivery
Sinopro Service Pledge
Sinopro Service Pledge
  • Credit Rating
  • Credit Services
  • Credit Purchasing
Sinopro Service Pledge
Sinopro Service Pledge
  • 427+ Categories
  • 2800+ Suppliers
  • 200+ Brands
Top