Package A for Stage 2 of Etihad Rail

Publish date: 2020-05-16 11:12:24
Source: sinopro.ae
Project
Package A for Stage 2 of Etihad Rail
Owner or Developer
Etihad Rail
Main Contractor
CSCEC Middle east
Project Duration
11 years
Total Tender value
USD 410M
Status
Completed
Address
From Ruwais to Ghuweifat Border
Cooperation details of the projects
Agreggates, steel

Package A for Stage 2 of Etihad Rail

The project s scope of work involves the construction of a 139-kilometer railway line with the double track from Ghuweifat to Ruwais in Abu Dhabi. The project includes the design and construction of rail infrastructure including earthworks bridges tunnels animal crossings, track-laying, and links to Stage 1 of Etihad Rail. The route will comprise a standard-gauge double-track built from 1.1 million tonnes of ballast, more than 400,000 concrete sleepers, and almost 30,000 tonnes of iron rail.